Florida guide

Construction and Handover in Florida

The numbers

Illustrative land cost$500k to $5M for coastal parcels; Naples, 30A, Sarasota and Palm Beach vary widely by street and view.
Illustrative build cost$650 to $1,400 per square foot for hurricane-rated, impact-glazed custom construction.
Climate exposureSubtropical with hurricane exposure, elevated water tables and year-round construction weather.
Regional vernacularGulf and Atlantic contemporary, coastal traditional, board-and-batten cottage and refined stucco. Standing seam metal, impact glass, deep covered porches, elevated foundations, salt-tolerant plantings.
Permit pathwayBuilding permits are municipal or county; coastal construction, environmental and DEP approvals may precede local permit and drive schedule.

Key risks in Florida

  • FBC High-Velocity Hurricane Zone and wind-borne debris requirements
  • FEMA flood zone, base flood elevation and finished floor requirements
  • Coastal Construction Control Line permitting through Florida DEP
  • Septic and stormwater rules on barrier islands and near wetlands

Frequently asked in Florida

How long does construction take in Florida?

A well-run 5,000 square foot custom home in Florida typically takes 14 to 20 months from groundbreaking to certificate of occupancy, plus 30 to 60 days for punch and closeout.

What inspections happen during a FL build?

Foundation, framing, rough MEP, insulation, energy code, and final. On coastal or environmentally sensitive sites, add stormwater, dune, wetland or shoreland inspections.

What should the handover package include?

As-built drawings, warranty schedule, equipment manuals, finish and material log, subcontractor directory and a first-year service plan. Every homeowner should receive a bound and digital copy on day one.